Purpose
Use a structured form to record observations, checks and escalation requirements. The form should reflect the approved method statement and site-specific ecological controls.
Configuration steps
- Create the form using the approved inspection/checklist template.
- Record site, job, operative, date and location/reference information required by the project.
- Use clear yes/no/not applicable choices, with instructions explaining when “not applicable” is allowed.
- Use conditional logic to reveal observation details, photographs and escalation fields when an issue is identified.
- Set up an appropriate notification to the designated supervisor or ecology contact where required.
- Test normal, exception and escalation paths.
Governance
Do not use a generic form to replace project-specific ecological instructions, licences, exclusion zones or stop-work procedures. The form should record the required action; the approved site procedure determines what action is required.